Checklist for Flipping Houses: Free PDF Download (2026)

A checklist for flipping houses walks one deal through eight phases, from lining up your money and finding the house to the day the sale closes. Three of those phases end in a go/no-go check: before you make an offer, before your inspection contingency runs out, and before you sign at closing. Those are the last points where walking away is still cheap.
The items that trip flippers up come with the reason they’re on the list. The rehab phase includes a room-by-room house rehab checklist for your walkthrough with the contractor, and the whole thing is a free printable PDF you can take to the property. It covers the order of the work rather than the strategy behind it, so if you haven’t set your buying rules yet, start with a house flipping business plan.
Checklist for Flipping Houses: The 8 Phases at a Glance
A flip runs through eight phases in this order. The last column marks the three go/no-go gates.
| Phase | What you’re deciding | Go/no-go gate |
|---|---|---|
| 1. Line Up Money, Team, and Buy Box | What you can spend and who’s on your team | |
| 2. Find Deals | Which leads are worth a look | |
| 3. Run the Numbers | Your max offer and walk-away price | Gate 1: before you make an offer |
| 4. Make an Offer and Get Under Contract | Contract terms and contingencies | |
| 5. Due Diligence and Inspection | Whether the house still works after inspection | Gate 2: before the inspection contingency ends |
| 6. Close on the Purchase | Money, insurance, and keys | Gate 3: before you sign at closing |
| 7. Rehab | Scope, contractors, budget, and schedule | |
| 8. List and Sell | Price, buyer, and closing |
Our printable house flipping checklist PDF has the same eight phases with a checkbox for every item and blank lines for your numbers. Pages 3 and 4 hold the room-by-room rehab checklist, with columns for notes, quantities, and what each repair will cost. Download it below!
Before You Look at Houses: Money, Team, and Buy Box
Three things need to be in place before your first showing: the money, the team, and a written buy box. The deals I’ve locked up fastest were the ones where I could make an offer the same day, and that only works when the calls to lenders and contractors already happened.
Money and Financing for a Flip
Know how much cash you can put in for the down payment, the part of the rehab your lender won’t cover, and a reserve for surprises.
Most fix and flip investors borrow from a hard money lender, a short-term lender that funds based on the deal more than your income, or from a private lender. Get the terms in writing before you shop, including the rate, the points, how much of the purchase and rehab they’ll cover, and how draws work. A mortgage pre-approval, the usual first step for a home buyer, doesn’t fit most flips, since a regular mortgage takes longer to close, won’t fund the rehab, and often can’t be used on a house that needs major repairs. Ask your lender for a proof of funds letter instead, because sellers often want one with the offer.
Your House Flipping Team
Line up these people before you need them:
- An agent who knows investor deals and will send you houses that fit your criteria.
- A general contractor who’s willing to walk houses with you before you buy.
- A title company or real estate attorney, depending on which one handles closings in your state.
- An insurance agent who writes policies for vacant houses under renovation.
- A certified public accountant (CPA) who works with flippers.
Write Down Your Buy Box
Your buy box is the set of rules for what you’ll buy: the areas you’ll buy in, your price range, the house types you want, and the heaviest rehab you’re willing to take on. It keeps you from chasing every lead that sounds cheap. Lenders who fund flips will also want a deal package on each house before they commit, and a clear buy box makes those faster to put together.
Finding Houses to Flip
The best flips come from sellers who need a quick, simple sale more than they need top dollar, so this phase is about the seller’s situation as much as the house.
- Pick 2 to 3 deal sources and work them every week, whether that’s the multiple listing service (MLS) through an investor agent, wholesalers, auctions, or marketing directly to owners.
- Track every lead with a next follow-up date, because most sellers aren’t ready the first time you talk.
- Watch for the seller situations that bring discounts, such as vacant houses, inherited houses, tired landlords, and owners in pre-foreclosure.
- See houses that fit your buy box within a day or two, before another buyer does.
Vacant houses are a good place to start, since an owner paying taxes and insurance on an empty property often wants out. Heirs selling inherited houses are similar, especially when they live out of state and have no interest in managing a renovation. If you’re starting from zero, learn how to find motivated sellers through public records and online sources before you spend money on marketing.
After my first year of flipping, I stopped buying cheap raw lists and started paying only for leads from sellers who had already shown they wanted to sell. I had fewer dead phone numbers and more time to look at houses. Buying off-market leads by county works the same way, as long as each one comes from a seller who has shown they’re open to selling.
Run the Numbers Before You Make an Offer
Every offer starts from the sale price and works backward. The after repair value (ARV) is what the house should sell for once it’s renovated, and every cost of the flip comes out of it before you know what you can pay.
Numbers to Calculate Before You Offer
Before you offer, have these written down:
- ARV from renovated comps that sold within about half a mile, in the last 6 months, and within 15% of your house’s square footage.
- A rehab estimate from a walkthrough with your contractor rather than a price per square foot.
- A 15% contingency on top of the rehab estimate.
- Holding costs, such as taxes, insurance, utilities, and interest, priced for 1.5 times the timeline you expect.
- Financing costs, including points, interest on the money you’ve drawn, and draw fees.
- Buying and selling costs, including closing costs, agent commissions, and any concessions to the buyer.
- The minimum profit you’ll accept on this deal.
- A max offer screened with the 70% rule (70% of ARV minus repairs), then checked against your real costs.
- A walk-away price, written down before you talk to the seller.
The 15% contingency and the 1.5x holding cushion are rules I’ve used on every flip since 2023, after a Columbus deal ran 3 months long and cost me more than half the profit.
Gate 1: Check Your Minimum Profit
Be careful with published profit figures when you set your minimum. ATTOM put the typical gross profit on a flip at $60,526 in the second quarter of 2026, but that’s only the resale price minus the purchase price, and flippers estimate rehab and their other costs at 20% to 33% of the ARV (ATTOM, 2026). Those costs come out of the gross figure before you see a dollar.
A comparative market analysis is the long version of the comps step. For the rest of the math, a house flipping spreadsheet runs every line above and shows your max offer from real costs next to the 70% rule.
This is Gate 1. If the deal doesn’t clear your minimum profit at your max offer, don’t make the offer. You’ve spent an afternoon on it, and that’s the cheapest place a deal will ever let you stop.
Making an Offer and Getting Under Contract
The contract decides how much room you have to back out later, so most of this phase is about contingencies:
- An inspection contingency long enough to get the inspector, your contractor, and an insurance quote in, often 10 to 14 days.
- A financing contingency if a lender is involved.
- Access for your contractor before closing, written into the contract.
- The earnest money amount and the date it becomes nonrefundable.
- Proof of funds sent with the offer.
- A real estate attorney’s review, at least on your first few contracts.
Contract forms, contingency rules, and who holds the earnest money vary by state, which is why the attorney review is on the list. Start from a solid purchase agreement and adjust it with your attorney instead of writing terms from scratch.
Buying from an owner who lives in the house and is behind on the mortgage needs extra care. Some states, New York among them, have equity purchaser laws that dictate the contract’s wording and give the seller days to cancel after signing (New York State Senate, 2026), so on a pre-foreclosure deal the attorney review isn’t optional.
Expect most offers to be turned down. Motivated sellers say no for reasons that have nothing to do with you, and some of them call back weeks later. Knowing what to offer a seller in a hard spot, and how to explain the number, gets more of them to yes.
Due Diligence and Inspection Checklist for a Flip
Due diligence is everything you check between signing the contract and the end of your inspection contingency, while backing out still costs little or nothing.
Why the Insurance Quote Belongs in the Inspection Window
In 2025 I had a 1920s two-story on Columbus’s south side under contract at $121,000, with a 10-day inspection contingency. The plaster walls looked fine on my walkthrough. The inspector found live knob-and-tube wiring on the second floor, and my insurance agent told me the carrier wouldn’t write the vacant renovation policy until it was gone. By day 6, I had the insurer’s answer and an electrician’s quote of $11,800 to rewire the second floor and replace the panel. I sent both to the seller, and we settled at $112,000.
If that wiring had turned up after closing, all $11,800 would have come out of my profit, and the job couldn’t have started until the insurance was sorted out. The insurance quote and the contractor walk belong inside the contingency window for that reason.
Due Diligence Items to Check Before the Deadline
Before the contingency ends, check off:
- A general home inspection.
- A sewer line camera inspection on older houses.
- The roof, foundation, electrical panel and wiring type, plumbing, and the age of the heating, ventilation, and air conditioning (HVAC) system.
- Termite and radon checks where they’re common.
- A contractor walk to firm up the rehab bid.
- An insurance quote for a vacant house under renovation.
- A title search and lien check.
- The permit history, including any open permits.
- Homeowners association (HOA) and zoning rules, if they apply.
- A plan for lead-safe work if the house was built before 1978.
- A decision to renegotiate, proceed, or cancel before the contingency ends.
The lead-safe item is a legal requirement for flippers. Under the Environmental Protection Agency’s (EPA) Renovation, Repair and Painting (RRP) rule, anyone paid to do work that disturbs paint in a pre-1978 home must be certified, and the rule covers people who buy, renovate, and sell homes for profit (EPA, 2026). Some states run their own version of the program, so check which one applies to your house.
A full due diligence checklist goes further, with surveys and environmental reports for bigger purchases. For the inspection itself, a home inspection checklist shows what a good inspector should cover.
This is Gate 2. Once the contingency ends, backing out usually costs you the earnest money, so make the call while it’s still free.
Closing on the Purchase
The week before closing is about money, insurance, and keys.
- Confirm the closing date with your lender and title company.
- Check the settlement statement line by line. A hard money loan is a business loan, so you’ll usually get the title company’s settlement statement rather than the Closing Disclosure home buyers get.
- Confirm wiring instructions by phone, using a number you already have, before you send money.
- Make sure insurance is active on closing day.
- Do a final walkthrough to confirm the house is in the condition you agreed to buy.
- Rekey the locks or install a lockbox.
- Put the utilities in your name.
- Take before photos and video of every room.
Wire fraud targets real estate closings because the amounts are large, and a fake email with new wiring instructions is the usual trick. Lenders want the before photos for draw requests, and the buyer’s appraiser will want them when you sell.
The final walkthrough is Gate 3. If a pipe burst or the seller left a basement full of junk, settle it before you sign.
House Rehab Checklist (Room by Room)
A house rehab checklist is the list you walk with your contractor to turn a house into a written scope of work, then use to run the job. Walk the outside first, check the systems before the finishes, and give every item a quantity, because “replace flooring” means nothing to a bidder until it says how many square feet.
Walkthrough Checklist for the Scope of Work
Mark each item OK, repair, or replace, the same way the printable checklist does. Every repair or replace becomes a line in the scope.
| Area | What to check |
|---|---|
| Exterior | Roof, gutters, siding, windows, doors, drainage, driveway |
| Structure | Foundation, basement water, framing, sagging floors |
| Systems | Electrical panel and wiring, plumbing, sewer line, water heater, HVAC |
| Kitchen | Cabinets, counters, appliances, sink, lighting, flooring |
| Bathrooms | Tub or shower, toilet, vanity, tile, fan, subfloor around the toilet |
| Living areas and bedrooms | Flooring, walls, ceilings, paint, doors, trim, closets |
| Basement, attic, and garage | Insulation, moisture, ventilation, garage door, laundry |
| Safety | Smoke and carbon monoxide detectors, stairs, egress windows, lead paint, asbestos |
Systems come before finishes because they move the budget more. A new furnace and electrical panel can cost more than the whole kitchen, and they’re easy to miss when the kitchen is the first thing you see. Old houses also hide their expensive problems in the same few places: under the toilet, behind plaster, and inside the panel.
Bids, Contracts, and Permits
Get at least two bids on the same written scope, so you’re comparing prices rather than two different jobs.
- Send the same scope to every bidder.
- Collect each contractor’s license and insurance certificates.
- Sign a contract with a draw schedule tied to finished work, not calendar dates.
- Put in writing who pulls which permits.
- Hire a lead-safe certified firm for any paint-disturbing work on a pre-1978 house.
- Order long-lead materials early, such as windows and special-order cabinets.
- Get the dumpster, a temporary toilet if needed, and utilities set up before day one.
Paying for finished work protects you if a contractor walks off the job halfway through. Paying by the calendar can leave you funding work that never gets done.
Running the Rehab Week by Week
Visit the site on a schedule, compare spending to the budget every week, and get every change in writing before the work happens.
- A site visit with photos.
- Budget vs actual spending, checked weekly.
- Change orders signed before the work is done.
- Draw requests sent with photos of finished work.
- A lien waiver from the contractor with every payment.
- Inspections booked as each phase finishes.
Lien waivers are the easiest item to forget. A lien waiver is a contractor’s signed statement that they’ve been paid for the work, and without one, an unpaid subcontractor can file a lien on your house right before you sell. When a category runs over, cut scope somewhere else before you touch the contingency. I log every expense the day I pay it and check budget vs actual each week, which is how I’ve caught overruns while there was still something left to cut.
Listing and Selling Your Flip
Selling a flip has two checklists: what to finish before the listing goes live, and what to manage once a buyer signs.
Before You List the House
On a 2025 flip in Grove City, just outside Columbus, my electrician never scheduled the final inspection on his permit. Nobody noticed until the buyer’s agent pulled the permit history about two weeks before closing. Getting an inspector out and the permit closed pushed closing back 3 weeks and cost me about $1,350 in extra interest, insurance, and utilities. Now every permit has to be closed before the listing photos get taken.
Before you list:
- Every permit inspected and closed.
- The punch list finished and a final clean done.
- A pre-listing inspection, if you want to find problems before the buyer’s inspector does.
- Staging, starting with the living room, primary bedroom, and kitchen.
- Professional photos.
- A list price from fresh comps, pulled the week you list.
- The listing itself, with an agent or as a for sale by owner (FSBO) sale.
Staging is worth the money on most flips. In the National Association of Realtors’ (NAR) 2025 staging survey, 29% of sellers’ agents said staging raised the dollar value buyers offered by 1% to 10%, and buyers’ agents named the living room, primary bedroom, and kitchen as the rooms that matter most to buyers (NAR, 2025). The median cost was $1,500 with a staging service (NAR, 2025).
From Accepted Offer to Closing
Once you’re under contract:
- Compare offers on net proceeds, not price alone.
- If the buyer is using a Federal Housing Administration (FHA) loan, check that their contract is signed more than 90 days after you bought the house.
- Decide ahead of time how you’ll answer the buyer’s inspection: repair, credit, or hold firm.
- Give the appraiser a package with your scope, costs, and before and after photos.
- Get ready for the buyer’s final walkthrough.
- Close, pay off your lender, and finish the profit and loss statement.
The FHA item catches flippers who move fast. FHA won’t insure a mortgage when the buyer’s contract is signed 90 days or less after the seller acquired the house, and between 91 and 180 days, a resale price 100% or more above what the seller paid means extra documentation, such as a second appraisal (eCFR, 2026). In the second quarter of 2026, 10.7% of flipped homes sold to buyers using FHA-backed mortgages (ATTOM, 2026), so a fast rehab can shrink your buyer pool for a few weeks.
The buyer’s final walkthrough confirms the house matches the contract, so leave the utilities on until the day you close. After that, close the books. A profit and loss statement for the flip shows what you made after every cost, and it’s what your CPA will ask for at tax time.
How Long It Takes to Flip a House, Phase by Phase
The typical flip took 161 days from purchase to resale in the second quarter of 2026, a little over 5 months (ATTOM, 2026). That clock starts when you buy, so it doesn’t count the weeks spent finding the deal or getting it under contract.
| Phase | Typical time on my flips |
|---|---|
| Under contract to purchase closing | 2 to 4 weeks with hard money |
| Rehab, mostly cosmetic | 6 to 10 weeks |
| Rehab, heavy | 3 to 5 months |
| Listing to accepted offer | 1 to 4 weeks |
| Accepted offer to closing | 30 to 45 days with a financed buyer |
Those are my numbers in the Columbus area, not national averages. Time costs more in some markets than others. In the first quarter of 2026, fix and flip loans in Backflip’s data were paid off in about 90 days on average in Atlanta and Dallas-Fort Worth but took 154 days in Austin (ATTOM and Backflip, 2026). Every extra month adds interest, taxes, insurance, and utilities, which is why the checklist prices holding costs for 1.5 times the timeline you expect.
Start Your Checklist for Flipping Houses With the Deal
Every phase after the second one assumes you’ve found a house worth running through it, and that’s where most first flips stall. A checklist keeps a good deal from going wrong, but it can’t put one in front of you.
UndervaluedX lists motivated seller leads that are checked before they go on the exchange, so the sellers you call have shown they’re open to selling. On the UndervaluedX exchange, you choose the counties you flip in, set a max bid and a monthly budget, and pay only for the leads you win, with no contract. Print the checklist, pick your first county, and start filling in phase 2.
References
- ATTOM, 2026. Home Flipping Profits Continue Gradual Two-Year Decline.
- ATTOM and Backflip, 2026. Special Analysis: How Pricing, Renovation Costs and Timing Shaped Returns in Q1 2026.
- National Association of Realtors (NAR), 2025. NAR Report Reveals Home Staging Boosts Sale Prices and Reduces Time on Market.
- U.S. Environmental Protection Agency (EPA), 2026. Lead Renovation, Repair and Painting Program.
- Electronic Code of Federal Regulations (eCFR), 2026. 24 CFR 203.37a: Sale of Property.
- New York State Senate, 2026. Real Property Law Section 265-A: Home Equity Theft Prevention.
Frequently Asked Questions

Real Estate Expert
Real estate investment expert contributing valuable insights on motivated seller leads, off-market deals, and real estate investing strategies.
Related Articles
Stay Updated
Get the latest real estate investment insights delivered to your inbox.
Ready to Get Started?
Connect with motivated sellers and start building your real estate portfolio today.
Get Your Leads Now

